Printana Remote
  • About
  • Studio hours
  • Curating Prints
    • Print Terms
  • MATRIX press
  • UM PRINT PHOTO GALLERY
  • PRINTANA
  • UM PRINT PROGRAM
  • Important Links
  • Mellon Lecture Series
  • RELIEF
    • R1_Relief Handouts_S24
    • R_6 Transfer Methods
    • R7_Pin Registration 22
    • R1a_Basics of Cutting & Printing
    • R_7 Hand Printing
    • 4_MULTI-BLOCK
    • 2A_Reduction Project
  • SCREEN
    • S1_Screen Handouts_F21
    • S_A_Transparencies
    • 1_S_Self Portrait_S25
    • 2_S_Protest & Propaganda
    • 1AA_DRAWING MATERIALS
    • S78_Halftones
    • 2_CMYK_K_R
  • DC_F25
    • 1_DRYPOINT
    • 2_DRY_COLOR
    • 2A_Chine Colle Technical
    • 3_Collagraph
    • 6_Sharpening Tools
    • 7_Trouble Shooting

ARTZ 371: SCREEN PRINTING II / WEEKLY SCHEDULE   Spring 2021


Syllabi_ARTZ 371_SP2021_Prof. Bailey
File Size: 51 kb
File Type: pdf
Download File

If the building is closed on a holiday or weekend call UM Security at 243-6131.
If we are running low on screen supplies contact Jason Clark at [email protected]
NOTICE:  As this is the only upper division printmaking course being offered this semester, we will have students taking this course with a broad range of background experience.  From those who are taking this as their first printmaking course, to those who have taken multiple print courses.  In order to address the different levels and needs of these differing groups, I have set up 3 tracks.
​
  • TRACK 1: For those students taking Screenprinting for the first time or those who have only taken ARTZ 271/Screen will follow the projects outlined below.
  • TRACK 2: For those students who have successfully completed  ARTZ 371/Screenprinting II course in the past, will be given the option to follow along with the semesters projects or submit a written proposal of projects to substitute. In either case the total number of projects & deadlines will remain the same, and all other requirements, quizzes etc will still be required.
  • TRACK 3: For those students who have completed ARTZ 371/Screenprinting II & ARTZ 371/Relief II, will be given the option to follow along with the semesters projects or submit a written proposal of projects to substitute which may include relief/Screen or a combination of both.  Again, In either case the total number of projects & deadlines will remain the same, and all other requirements, quizzes etc will still be required.

END OF THE SEMESTER SCHEDULE:

WK 15/
Apr 19- Project 5 Class Portfolio Prints due & Critique
Apr 21- Mandatory Shop Clean Up & Distribute Class Portfolios & Last day to hand in late/re-worked assignments.

WK 16/
Finals Week/Clean out your locker & Flat file. Please remove all your materials, including your screens before May 1st. (The shop is not responsible for screens or materials left after that time).




Proudly powered by Weebly